Slope protection

CC Featured on Geosynthetica.net – Concrete Canvas Wins Major LNG Contract in Australia

Concrete Canvas has won a major contract to supply its Geosynthetic Cementitious Composite Mat (GCCM) for one of Australia’s largest resource projects: the Wheatstone liquefied natural gas (LNG) plant in Western Australia. Worth more than US$1M the contract supplies more than 32000 m2 of Concrete Canvas® GCCM (CC) for a range of erosion control measures. View the whole article here.

Mining Channel lining

CC Featured on Geosynthetica.net – Concrete Composite Mat Excels in Railway Project

In October 2015 a Geosynthetic Cementitious Composite Mat (GCCM) was used to line a series of ditches along a railway in Liberdade Minas Gerais Brazil. The site was characterized by severe access issues. Several of the ditches were cut into steep slopes on either side of the railway. Poured concrete was considered for the installation; however this would have required lengthy line closures and complex costly logistics. View the whole article here.